The introduction of CRH series was a major part of the sixth national railway speedup, implemented on April 18, 2007.[1] By the end of 2020, China Railway High-speed provided service to all provinces in China, and operated just under 38,000 km (24,000 mi) passenger tracks in length, accounting for about two-thirds of the world's high-speed rail tracks in commercial service.[2][3][4] China has revealed plans to extend the HSR to 70,000 km by year 2035.[4] It is the world's most extensively used railway service, with 2.29 billion bullet train trips delivered in 2019[5] and 2.16 billion trips in 2020,[6] bringing the total cumulative number of trips to 13 billion as of 2020.[7][8]
Over 1000 sets of rolling stock are operated under the CRH brand including HexieCRH1/2A/5 that are designed to have a maximum speed of 250 km/h (160 mph), and CRH2C/3 have a maximum speed of 350 km/h (220 mph). The indigenous designed CRH380A have a maximum test speed of 416.6 km/h (258.9 mph) with commercial operation speed of 350 km/h. The fastest train set, CRH380BL, attained a maximum test speed of 487.3 km/h (302.8 mph). In 2017, the China Standardized EMU brand including CR400AF/BF and CR200J joined China Railway High-speed and are designated as Fuxing together with letters CR (China Railway).[9][10] With a gradual plan, the CR brand is going to replace the current CRH brand in service.[11] China’s CRH380A Hexie developed by CSR Corporation Limited. it is designed to operate comfortably at a speed of 350 km/h (217 mph) and a maximum speed of 380 km/h (236 mph),it is also the fastest train in the world. During testing it also reached 486.1 km/h (302.0 mph).[12]
Depending on their speed, there are 3 categories of high speed trains, G, D and C (G and some C being the fastest at 350 km/h, D having a speed of 250 km/h and C having a speed of 200 km/h).[13]
High-speed rail services were first introduced in 2007 operating with CRH rolling stock. Those run on existing lines that have been upgraded to speeds of up to 250 km/h (160 mph) and on newer dedicated high-speed track rated up to 350 km/h (220 mph).
China will continue to operate the largest high-speed rail (HSR) network in the world by the end of 2021, with a length of over 40,000 km (24,855 mi). Beijing to Hong Kong High Speed Railway, the longest HSR route in the world, stretches 2,440 km (1,516 mi).[14]
CRH service on dedicated high-speed lines
Table:CRH service on high-speed rail lines
The following table lists the frequency of CRH service on 14 HSR lines (as of August, 2012). In some cases, CRH trains must still share the HSR lines with slower, non-high-speed trains, which are listed in the table. Note China's first HSR, the Qinshen PDL service as part of the Jingha Railway.
Line (route)
Length (main line)
Travel time (By fastest train)
Trains per day[15] (aggregation of both direction)
As of September 2010, there were 2,876 kilometres (1,787 mi) of upgraded conventional railways in China that can accommodate trains running speeds of 200 to 250 km/h.[50] Over time with the completion of the national high-speed passenger-dedicated rail network, more CRH service will shift from these lines to the high-speed dedicated lines.
A. Intercity service (typically, listed in schedules as C-series or D-series trains):
Unlike the "conventional" (non-CRH trains), which run round the clock, most high-speed rail lines operations shut down each night. There are several sleeper EMU services (abbreviated 动卧, dòngwò) running on the upgraded rail or high-speed lines operated with CRH1E and CRH2E trains.
Conventional higher-speedZ-series overnight rail services may also use certain sections of the high-speed rail network; e.g., the planned Shanghai-Chengdu train Z121/2/3/4 will use the Huhanrong PDL from Nanjing to Wuhan.[67]
With the schedule change planned for December 21, 2012, some of these trainsets will be re-purposed to also provide overnight high-speed service between Shanghai and Xi'an North.[67] In the 2014, Chunyun season, overnight HSR trains first ran on Beijing-Guangzhou (Jingguang) and other lines.
In November 2016, CRRC Changchun unveiled CRH5E bullet train carriages with sleeper berths. Made in the CRRC factory in Changchun and nicknamed Panda, they are capable of running at 250 km/h, operate at -40 degrees Celsius, have Wi-Fi hubs and contain sleeper berths that fold into seats during the day.[68] In 2017, CRRC unveiled a high speed train with double decked sleeper "capsules" classed as the CRH2E series high speed rail train.[69]
On January 5, 2019, the CR200J entered service replacing many locomotive-hauled trains.[70]
Rolling stock
China Railway High-speed runs different electric multiple unit trainsets, the name Hexie Hao (simplified Chinese: 和谐号; traditional Chinese: 和諧號; pinyin: Héxié Hào; lit. 'Harmony') is for designs which are imported from other nations and designated CRH-1 through CRH-5 and CRH380A(L), CRH380B(L), and CRH380C(L). CRH trainsets are intended to provide fast and convenient travel between cities. Some of the Hexie Hao train sets are manufactured locally through technology transfer, a key requirement for China. The signalling, track and support structures, control software, and station design are developed domestically with foreign elements as well. By 2010, the track system as a whole is predominantly Chinese.[71] China currently holds many new patents related to the internal components of these trains, re-designed to allow the trains to run at higher speeds than the foreign designs allowed. However, these patents are only valid within China, and as such hold no international power. The weakness on intellectual property of Hexie Hao causes obstructions for China to export its high-speed rail related products, which lead to the development of the completely redesigned train brand called Fuxing Hao (simplified Chinese: 复兴号; traditional Chinese: 復興號; pinyin: Fùxīng Hào; lit. 'Rejuvenation'), based on indigenous technologies.[71][72][73][74]
CRH2A: In 2006, China unveiled CRH2, a modified version of the Japanese Shinkansen E2-1000 series. An order for 60 8-car sets had been placed in 2004, with the first few built in Japan, the rest produced by Sifang Locomotive and Rolling Stock in China.[75]
CRH2B: a modified 16-car version of CRH2; maximum operating speed of 250 km/h
CRH2C (Stage one): a modified version of CRH2 with a maximum operating speed up to 300 km/h as a result of replacing two intermediate trailer cars with motored cars
CRH2C (Stage two): a modified version of CRH2C (stage one) has a maximum operating speed up to 350 km/h by using more powerful motors
CRH2E: a modified 16-car version of CRH2 with sleeping cars
CRH3: nickname "Rabbit", derived from SiemensICE3 (class 403); 8-car sets; maximum operating speed of 350 km/h
CRH6: designed by CSR Puzhen and CSR Sifang, will be manufactured by CSR Jiangmen. It is designed to have two versions: one with a top operating speed of 220 km/h; the other with a top operating speed of 160 km/h. They will be used on 200 km/h or 250 km/h Inter-city High Speed Rail lines; planned to enter service by 2011[clarification needed]
CRH380D: also named Zefiro 380; maximum operating speed of 380 km/h, manufactured by Bombardier Sifang (Qingdao) Transportation Ltd.; entered service in 2012
CRH380DL: 16-car version (Cancelled in place of additional CRH1A and Zefiro 250NG sets)
CRH1A, B,E, CRH2A, B,E, and CRH5A are designed for a maximum operating speed (MOR) of 200 km/h and can reach up to 250 km/h. CRH3C and CRH2C designs have an MOR of 300 km/h, and can reach up to 350 km/h, with a top testing speed of more than 380 km/h. However, issues such as maintenance costs, comfort, and safety make the maximum speed of more than 380 km/h impractical and remain limiting factors.[citation needed]
Fuxing (Rejuvenation)
CR400AF: Maximum operating speed of 400 km/h; Developed by CRRC Qingdao Sifang, guided by Chinese EMU standard.
italics indicate rough estimates for 2022, 2023, not final figures
Annual HSR ridership is highest in the world and has ramped up very quickly, as self-reported by rail authorities. China is the third country, after Japan and France, to have reached one billion cumulative HSR passengers. Ridership in 2018 was above 2 billion per year. Nevertheless, as a breakdown for lines and services is not available, system ridership may be overestimated given that transfer connections within the system may[weasel words] be counted as new passengers each time.
Before the introduction of foreign technology, China conducted independent attempts to domestically develop high-speed rail technology. Some notable results included the China Star, but domestic companies lacked the technology and expertise of foreign companies, and the research process consumed a large amount of time. In 2004, the Chinese State Council and the Ministry of Railways defined a modern railway technology and equipment policy as "the introduction of advanced technology, the joint design and production, to build China brand". The realization of the railway "leapfrog development" is the key task required to develop and utilize the technology required for high-speed trains (higher than 200 km/h or 124 mph per hour). In 2007, Chinese state media quoted the People's Republic of China Ministry of Railways spokesman Zhang Shuguang to have stated that due to historical reasons, China's overall railway technology and equipment is similar to that of developed countries' rail systems in the 1970s; high-speed rolling stock development is still in its infancy stage. And that if using only their own resources and expertise, the country might need a decade or longer to catch up with developed nations.[109]
Technology introduction
On April 9, 2004, the Chinese government held a conference on modern railway equipment and rolling stock, in which they drafted the current Chinese plan to modernize the country's railway infrastructure with advanced technologies.
On June 17, 2004, the Ministry of Railways launched the first round of bidding on the high-speed rail technology, but the company must be:
legally registered in the PRC, with rail EMU manufacturing capacity
able to manufacture trains with the ability to reach 200 km/h (124 mph)
High-speed EMU design and manufacturing technology companies, including Siemens, Alstom, Kawasaki Heavy Industries and Bombardier, initially had hoped to enter into a joint venture in China, but was rejected by the Ministry of Railways. The MOR set these guidelines for joint ventures to be acceptable:
comprehensive transfer of key technologies
lowest price in the world
use of a Chinese brand
A comprehensive transfer of technology to Chinese enterprises (especially in systems integration, AC drive and other core technologies) was requested to allow domestic enterprises to access and utilise the core technology. While foreign partners might provide technical services and training, the Chinese companies must ultimately be able to function without the partnership.[110] Railway equipment manufacturers in China were free to choose foreign partners, but foreign firms must pre-bid and sign the technology transfer agreement with China's domestic manufacturers, so the Chinese rolling stock manufacturers could comprehensively and systematically learn advanced foreign technology.[111] However, this requirement to sign over all rights to the technology used in the trains was a significant barrier to international involvement in the project, as the companies would lose access to any technology that they used on the trains.
In the first round of bidding, 140 rolling stock orders were divided into seven packages of twenty orders each. After extensive review and negotiation, three consortiums won the bid:
These three consortiums were each given three, three, and one twenty order packages respectively.[111] Germany's Siemens, as a result of an expensive technology bid — the prototype vehicle cost was 350 million yuan each column, technology transfer fee 390 million euros — did not get any orders in the first round.[112][113] EMU tendered 22.7 billion yuan for technology transfer payments in the first payment, accounting for 51 per cent of the amount of the tender.
In November 2005, the Chinese Ministry of Railways and Siemens reached an agreement, and Siemens in a joint venture with Changchun Railway Vehicles and Tangshan Railway Vehicle (both owned by CNR) was awarded sixty 300 km/h (186 mph) high-speed train orders.
Innovation
The introduction of high-speed trains, a foreign advanced technology, was required in order to implement China's "Long-term Scientific and Technological Development (2006–2020)". The core technology innovations necessary for a high-speed rail system to meet the needs of China's railway development resulted in the Ministry of Science and Ministry of Railways signing the "independent innovation of Chinese high-speed train cooperation agreement Joint Action Plan" on February 26, 2008.[114] Academicians and researchers from CAS, Tsinghua University, Zhejiang University, Southwest Jiaotong University, and Beijing Jiaotong University have committed to working together on basic research into improving China's scientific and industrial resources into developing a high-speed train system.
Under the agreement, China's joint action plan for improvement of train service and infrastructure has four components:[115]
Develop key technologies to create a network capable of supporting trains' speeds of 350 km/h (217 mph) and higher
Establish intellectual property rights and international competitiveness
Ministry of Science and the Ministry of Railways will work together to enhance industry research alliances, and innovation capability
Promote China-related material and equipment capacity
The Chinese Ministry of Science has invested nearly 10 billion yuan in this science and technology plan, which is by far the largest investment program. The project has brought together a total of 25 universities, 11 research institutes, and national laboratories, and 51 engineering research centers. The Ministry of Science hopes to develop basic research sufficient to produce key technologies necessary to develop trains capable of 500 km/h (310 mph) through the "863 Project" and "973 Project".[116]
Technology export
On July 27, 2009, Chinese Ministry deputy chief engineer Zhang Shuguang stated that the United States, Saudi Arabia and Brazil are interested in Chinese high-speed railway technology. On July 28, the Federal Railroad Administration and the US government are negotiating on the introduction of Chinese railway technology.[117] On October 14, 2009, Prime minister of RussiaVladimir Putin and the Russian Railroad Administration signed an Organizing and developing railway in Russia memo with Ministry of Railways of China, planning to build a high-speed railway from Vladivostok to Khabarovsk.[118]
On July 23, 2011 at approximately 20:00 CST, two high-speed trains travelling on the Yongtaiwen railway line No. D301 and No. D3115 bound for Fuzhou collided on a viaduct near Wenzhou, Zhejiang, leading to 40 deaths and 191 injuries. Both trains were on the same rail track, headed in the same direction. D3115 ground to a halt in front of D301 due to a loss of electric power caused by lightning striking a viaduct near the Ou River. Signalling systems purportedly failed, and D301 rear-ended the first train, sending four carriages off the viaduct.[119][120]
On June 4, 2022 at 10:30 CST, train D2809 bound for Guangzhou East from Guiyang North ran into a landslide near the Rongjiang Station on the Guiyang-Guangzhou High-speed railway. The driver engaged emergency brake, and two carriages were derailed and hit the platform of Rongjiang Station, killing the driver and injuring 8 passengers.[121] The remaining 136 passengers were safely evacuated. This is the second fatal incident in China’s high speed rail history.[122]
^ ab南京到西安可以乘动车了 去哈尔滨也有始发站列车 (One will be able to ride an EMU from Nanjing to Xi'an. There also will be a [Nanjing-originated] service to Harbin) 2012-12-14 (in Chinese) (The planned Nanjing-Harbin service mentioned in the article will be "conventional", not high-speed)
^Wines, Michael; Bradsher, Keith (February 17, 2011). "China Rail Chief's Firing Hints at Trouble". The New York Times. Retrieved December 27, 2012. Many multinational companies also resent China for tweaking foreign designs and building the equipment itself rather than importing it.
^Johnson, Ian (June 13, 2011). "High-Speed Trains in China to Run Slower, Ministry Says". The New York Times. Retrieved December 27, 2012. In the past few months, some foreign companies that sold China its high-speed technology said the trains were not designed to operate at 215 miles per hour. The ministry said that Chinese engineers had improved on the foreign technology and that the trains were safe at the higher speeds.
^ abcdCRH2型动车组详细资料及分类. news.chineserailways.com (in Simplified Chinese). December 14, 2009. Archived from the original on August 23, 2011.
^庞巴迪:又获铁道部动车组大订单. info.traffic.hc360.com (in Simplified Chinese). June 10, 2005. Archived from the original on June 26, 2016. Retrieved August 4, 2011.
^西门子专家进驻唐山机车车辆厂. hebei.moform.gov.cn (in Simplified Chinese). August 15, 2006. Archived from the original on August 17, 2011.
^唐车公司拿到京沪高铁动车组大订单 总金额392亿. info.china.alibaba.com (in Simplified Chinese). March 17, 2009. Archived from the original on March 4, 2012. Retrieved August 4, 2011.
^ ab中国南车:中标巨额合同 增厚公司业绩. www.guosen.com.cn (in Simplified Chinese). September 30, 2009.
^长客签下235亿订单. jlrbszb.chinajilin.com.cn (in Simplified Chinese). September 28, 2009. Archived from the original on July 7, 2011. Retrieved August 4, 2011.
^"Error" 中国高速铁路: 运量分析(PDF) (in Simplified Chinese). World Bank. December 2014. Archived from the original(PDF) on December 21, 2014. Retrieved October 17, 2015.