Railway line in Beijing, China
Daxing line Other name(s) M4 South (planned name) Line 4 South Status Operational Locale Fengtai and Daxing districtsBeijing Termini Stations 11 Type Rapid transit System Beijing Subway Operator(s) Beijing MTR Corporation Limited Depot(s) Nanzhaolu Rolling stock 6-car Type B (SFM05) Daily ridership 310,000 (2014 Avg. Daxing Line only)[ 1] 376,000 (2014 Peak Daxing Line only)[a] [ 2] Opened 30 December 2010; 14 years ago (2010-12-30 ) Line length 21.76 km (13.52 mi)[ 3] Character Underground and elevated Track gauge 1,435 mm (4 ft 8+ 1 ⁄2 in ) standard gauge Operating speed 100 km/h (62 mph) (maximum service speed)
The Daxing Line of the Beijing Subway (simplified Chinese : 北京地铁大兴线 ; traditional Chinese : 北京地鐵大興線 ; pinyin : Běijīng Dìtiě Dàxīng Xiàn ) is a rapid transit line that connects the southern Daxing District of the city with the subway network. It extends Line 4 south from its southern terminus at Gongyixiqiao, on the 4th Ring Road in Fengtai District , to Tian'gongyuan , beyond the 6th Ring Road in Daxing District . The Daxing Line is about 21.76 km (13.52 mi) in length[ 3] with 18 km (11 mi) underground.[ 4] [ 5] Daxing line contains 12 stations and is about 21.76 km (13.52 mi).[ 3] Initially, the Daxing line was planned to have 4 ground stations. However, due to lack of space, only Xihongmen was built above the surface.[ 6] Full-scale construction began in 2007 and the line was opened on 30 December 2010, 14:00 local time.[ 7] Daxing line's color is teal, the same as Line 4.
Route and service
Though the Daxing Line is classified as a distinct line,[ 8] the Beijing MTR Corporation Limited operates through-train service on Lines 4 and Daxing, making the two lines effectively one line for travelers.[b] With the opening of the Daxing Line on 30 December 2010, the Beijing MTR Corporation Limited now runs two types of train service on the combined Line 4-Daxing Line route:
A full-route service that covers the entire Line 4 and Daxing Lines. This train service runs from Anheqiao North, the northern terminus of Line 4, to Tian'gongyuan, the southern terminus of the Daxing Line.
A partial-route service that covers the entire Line 4 route plus one stop on the Daxing Line. This service runs from Anheqiao North to Xin'gong, the northernmost stop on the Daxing Line. Travelers wishing to proceed further south on the Daxing Line would have to switch to a south-bound full-route train.
Service routes
Stations
Diagram showing distinct line labels for the Daxing Line and Line 4 with through service .
Line 4 and Daxing line stations, from north to south:
Line Name
Service routes
Station Name
Connections
Nearby Bus Stops
Distancekm [ 10]
Location
English
Chinese
Line 4
●
●
Anheqiaobei
安河桥北
437 575 专28
0.000
0.000
Haidian
●
●
Beigongmen
北宫门
303 332 346 384 394 563 584 601 观光3 夜8
1.363
1.363
●
●
Xi Yuan
西苑
16
129 303 331 332 333 346 384 393 394 432 437 438 476 508 534 563 579 584 601 608 610 636 644 671 686 688 夜8
1.251
2.614
●
●
Yuanmingyuan Park
圆明园
129 331 424 432 438 508 579 601 664 观光3
1.672
4.286
●
●
Peking Univ East Gate
北京大学东门
129 305 307 320 331 355 365 375 438 450 549 579 601 614 681 982 观光3
1.295
5.581
●
●
●
Zhongguancun
中关村
26 302 305 307 320 332 355 365 384 392 400 400快 450 466 549 579 584 601 608 613 614 681 686 982 983 快速直达专线26 快速直达专线37 快速直达专线126 快速直达专线127 快速直达专线139 快速直达专线147 快速直达专线177 快速直达专线200 夜8
0.887
6.468
●
●
●
Haidian Huangzhuang
海淀黄庄
10
302 305 307 320 332 355 365 386 584 614 630 634 653 671 681 快速直达专线26 快速直达专线37 快速直达专线126 快速直达专线127 快速直达专线139 快速直达专线147 通医专线6 夜8 夜9
0.900
7.368
●
●
●
Renmin Daxue (Renmin Univ.)
人民大学
12
26 300 300快 302 305 320 323 332 355 361 365 368 425 549 584 614 651 653 658 695 921 快速直达专线139 夜8 夜30
1.063
8.431
●
●
●
Weigongcun
魏公村
26 305 320 332 563 603 609 645 651 653 658 695 夜8
1.051
9.482
●
●
●
Guojia Tushuguan (National Library)
国家图书馆
9 16
86 92 129 305 320 332 481 563 609 653 658 695 夜8
1.658
11.140
●
●
●
Dongwuyuan (Beijing Zoo)
动物园
7 15 16 19 27 56 65 87 102 103 105 107 111 129 305 332 334 347 360 360快 362 534 563 604 632 695 夜8
1.517
12.657
Xicheng
●
●
●
Xizhimen
西直门
2 13 Huairou–Miyun VAP
7 16 21 26 27 44 69 80 87 105 111 200 305 332 347 360 362 375 387 534 563 604 618 632 651 686 693 快速直达专线201 夜8 夜14 夜20 夜21 专216
1.441
14.098
●
●
●
Xinjie Kou
新街口
7 47 105 111 508 夜36
1.025
15.123
●
●
●
Ping'anli
平安里
6 19
3 4 7 13 22 38 42 47 88 105 107 111 118 143 409 夜3 夜4 夜10 夜21 夜36
1.100
16.223
●
●
●
Xisi
西四
3 13 22 38 42 88 101 102 103 105 109 124 143 409 612 夜4 夜10 夜13
1.100
17.323
●
●
●
Lingjing Hutong
灵境胡同
22 38 46 68 88 102 105 109 143 夜4 夜10
0.869
18.192
●
●
●
Xidan
西单
1
1 7 15 22 52 83 88 102 105 109 143 快速直达专线17 夜1 夜4 夜10
1.011
19.203
●
●
●
Xuanwu Men
宣武门
2
7 9 15 22 44 67 83 102 105 109 137 142 143 144 332 夜4 夜5 夜10
0.815
20.018
●
●
●
Caishi Kou
菜市口
7
5 6 48 57 83 102 105 109 144 381 夜4 夜7 夜10 夜18 专13
1.152
21.170
●
●
●
Taoranting
陶然亭
40 59 83 133 381 144 414 夜4 夜18 夜23 专13 专155
1.200
22.370
●
●
●
Beijing South railway station
北京南站
14 VNP Jingjin
20 106 133 200 343 381 414 458 485 529 652 665 夜15 夜17 夜24 专18 专53 专155
1.643
24.013
Fengtai
●
●
●
Majiapu
马家堡
51 66 72 134 144 485 501 529 954 夜18 专145
1.480
25.493
●
●
●
Jiaomenxi
角门西
10
30 51 72 144 474 501 529 646 954 快速直达专线160 夜18 专145 专209
0.827
26.320
●
●
●
Gongyi Xiqiao
公益西桥
377 400 474 511 556 602 646 685 825 954 990 快速直达专线160 专145 专209
0.989
27.309
Daxing line
●
●
●
Xingong
新宫
19
343 353 354 369 474 556 827 829 946 954 快速直达专线22 快速直达专线109 专59 专67 专190
2.798
30.107
●
●
Xihongmen
西红门
381 454 470 474 483 646 829 937 993 快速直达专线131 兴13 兴14 兴42 兴66 兴68 兴71 兴79 专84 专97 专169
5.102
35.209
Daxing
●
●
Gaomidianbei
高米店北
631 937 快速直达专线131 兴12 兴34 兴42 兴66 兴82
1.810
37.019
●
●
Gaomidiannan
高米店南
913 937 快速直达专线131 快速直达专线175 通医专线10 兴11 兴53 兴66 专24
1.128
38.147
●
●
Zaoyuan
枣园
410 631快 829 937 954 968 快速直达专线175 通医专线10 兴47 兴66 X101 X102 X104 X105 兴940
1.096
39.243
●
●
Qingyuan Lu
清源路
456 631 631快 829 913 934 954 968 969 快速直达专线175 快速直达专线188 通医专线10 兴23 兴24 兴26 兴27 兴28 兴30 兴33 兴35 兴37 兴48 兴53 兴54 兴66 X101 X105 X107 兴940
1.200
40.443
●
●
Huangcun Xidajie
黄村西大街
456 631 631快 829 840 913 934 954 968 快速直达专线175 快速直达专线188 通医专线10 兴11 兴14 兴14区 兴17 兴19 兴20 兴22 兴28 兴29 兴29区 兴31 兴31区 兴35 兴37 兴45 兴46 兴48 兴52 兴54 兴55 兴57 兴59 兴61 兴66 X105 X107 兴940
1.214
41.657
●
Huangcun railway station
黄村火车站
HCP
366 366快 369 631 631快 829 913 957 968 969 快速直达专线136 快速直达专线175 快速直达专线188 兴12 兴13 兴15 兴16 兴18 兴20 兴21 兴22 兴25 兴29 兴29区 兴37 兴45 兴46 兴55 兴66 X107
0.987
42.644
●
Yihezhuang
义和庄
456 934 快速直达专线175 通医专线10 兴13 兴15 兴16 兴25 兴37 兴44 兴45 兴46 兴48 兴55 兴65 兴66 兴77 兴81 兴82
2.035
44.679
●
Biomedical Base
生物医药基地
456 827 快速直达专线175 通医专线10 兴15 兴16 兴21 兴23 兴27 兴28 兴30 兴39 兴40 兴40区 兴41 兴44 兴46 兴48 兴52 兴53 兴54 兴55 兴55区 兴61 兴61区 兴64 兴65 兴66 兴68 兴77 兴80 兴81 兴82 X102
2.918
47.597
●
Tiangong Yuan
天宫院
456 827 829 940 快速直达专线15 快速直达专线175 通医专线10 兴11 兴21 兴23 兴27 兴28 兴30 兴39 兴40 兴40区 兴41 兴44 兴46 兴48 兴53 兴54 兴55 兴55区 兴61 兴61区 兴64 兴65 兴66 兴68 兴77 兴80 兴81 X102 X108
1.811
49.408
History
1 June 2008: Construction began on Daxing Line. Completion set for the end of 2011.[ 11]
16 November 2008: Completion date moved up to 28 December 2010.[ 12]
20 April 2010: Completion date moved again to 28 October 2010.[ 7]
30 December 2010: Daxing Line opened.
Segment
Commencement
Length
Station(s)
Name
Gongyi Xiqiao — Tiangongyuan
30 December 2010
21.76 km (13.52 mi)[ 3]
11
(initial phase)
Anheqiaobei — Gongyi Xiqiao
28 September 2009
see Line 4
(through services)
Rolling Stock
Notes
a. ^ Line 4 ridership included.
b. ^ See 北京京港地铁有限公司 (in Simplified Chinese). Beijing MTR Corporation Limited . 29 December 2010. Archived from the original on 1 January 2011. Retrieved 5 January 2011 . & "Beijing MTR Corporation Limited" . Mtr.bj.cn. 27 September 2010. Archived from the original on 9 October 2011. Retrieved 5 January 2011 . (English)
References
External links
Stations that are proposed, under planning or under construction are shown in italics .