Kokerboom–Auas High Voltage Power Line
The Kokerboom–Auas High Voltage Power Line, also Keetmanshoop–Dordabis High Voltage Power Line, is a high voltage electricity power line, under construction, connecting the high voltage substation at Kokerboom, near Keetmanshoop, in the ǁKaras Region to another high voltage substation at Auas, near Dordabis, in the Khomas Region of Namibia. [1] LocationThe 400 kilo Volt power line starts at the NamPower 400kV substation at Kokerboom, near the city of Keetmanshoop, in Namibia's ǁKaras Region. Kokerboom is about 16 kilometres (10 mi), by road, northeast of Keetmanshoop, on the road to Koes (M29 Highway).[2] The power line travels in a general northerly direction to end at another 400kV substation, also owned by NamPower, located at Auas, near the town of Dordabis, in the Khomas Region of Namibia. Dordabis is located about 94 kilometres (58 mi), southeast of the city of Windhoek the national capital and largest city in the country.[3] The power line passes through three Namibian regions; namely ǁKaras Region, Hardap Region and Khomas Region. Its length, from end to end is in excess of 800 kilometres (497 mi).[1] OverviewThe power line is being developed as part of plans to improve power delivery, reliability and stability of the Namibian electricity grid. This will ensure the safe and reliable importation of power from the South African utility, Eskom. In the future, when NamPower has excess electricity to sell to the Southern African Power Pool, this transmission line ensures, efficient means of transporting that power to South Africa and to its final destination. In addition, Namibia being a large country, with urban centres sparsely spaced out, transmission of power at these high voltages, reduces technical losses over those long distances.[1][4] HistoryIn 1981, a 220kV line served as the main backbone of the Namibian electricity grid and the means by which the country imported power from neighboring South Africa. Circa 1999, a single circuit 400kV transmission line was strung between the substation in Aries, South Africa to Auas outside Windhoek in Namibia to meet demand and stabilize the network.[4][5] It is anticipated that by 2023, that network will be insufficient to meet Namibia's expanding electricity needs. A new 400kV single circuit power line between Kokerboom and Auas is in the processes of development, to "ensure system reliability" and provide increased demand and expanded area of coverage.[4] Associated power linesThe current Engineering, Procurement and Construction (EPC) contract awarded to Power Line Africa (Pty), a Namibian company, includes the design and construction of a transmission line between Auas, Namibia and Gerus, Namibia, a distance of about 371 kilometres (231 mi).[1][6] ConstructionPower Line Africa (Pty), a local company is the main contractor on this project, at a reported cost of N$660 million (US$45.5 million). Construction is expected to begin in 2021 and last approximately 2 years.[1] See alsoReferences
External linksInformation related to Kokerboom–Auas High Voltage Power Line |