Share to: share facebook share twitter share wa share telegram print page

 

Redwood Solar Cluster

The Redwood Solar Cluster is a 100 MW photovoltaic power station that is located in Kern County, California. The final phase, named Redwood 4, was completed in March 2018, and is located 12 miles east of downtown Bakersfield. Redwood 4 is rated at 26 MW.[1][2]

References

  1. ^ "Redwood 4 blooms in California". RE News. March 7, 2018. Retrieved July 2, 2022.
  2. ^ "Redwood 4 Solar PV Park, US". Power Technology. February 2, 2022. Retrieved July 2, 2022.

35°19′22″N 118°48′45″W / 35.3229°N 118.8124°W / 35.3229; -118.8124


Prefix: a b c d e f g h i j k l m n o p q r s t u v w x y z 0 1 2 3 4 5 6 7 8 9

Portal di Ensiklopedia Dunia

Kembali kehalaman sebelumnya