Gibbs & Cox
Gibbs & Cox is an American naval architecture firm that specializes in designing surface warships. Founded in 1922 in New York City, Gibbs & Cox is now headquartered in Arlington, Virginia. The firm has offices in New York City; Washington, D.C.; Newport News, Virginia; Philadelphia, Pennsylvania; and New Orleans, LA.[1] In 2003, more than 150 warships built to the firm's designs, including 60 percent of the U.S. Navy's surface combatant fleet, were on active duty in nearly 20 navies.[citation needed] HistoryThe firm was founded as "Gibbs Brothers" by self-taught naval architect William Francis Gibbs and his brother Frederic H. Gibbs. The name was changed when architect Daniel H. Cox of Cox & Stevens joined the firm in 1929.[1] In 1931, Gibbs & Cox designed the MV Savarona, a large luxury yacht. According to company officials, more than 70 percent of U.S. tonnage launched during World War II was built to Gibbs & Cox designs. Ship types included destroyers, LST landing craft, minesweepers, tankers, cruisers, Liberty Ships, and a variety of conversions.[1][2][3] In 1950, Gibbs & Cox designed the SS United States, the largest liner ever built in the United States and the fastest liner built anywhere. On May 7, 2021, Leidos completed acquisition of Gibbs & Cox for $380 million. Gibbs & Cox operates as a wholly-owned subsidiary and is combined with Leidos’ maritime systems division.[4] Ships designedAmong the ship classes designed by Gibbs & Cox are:
Among the individual ships designed by Gibbs & Cox are: Model shopFrom 1939 until 1962, the firm operated a model shop that produced high-quality ship models that are considered among "the very finest examples of the steel ship modeler's art ever to be seen."[6] Of these, the most expensive and elaborate was a 1/24-scale cutaway model of the USS Agerholm. This model, which is over 16 feet long, shows the complete inner structure on the starboard, and the exterior on the port.[7] Another notable model is the USS Missouri as she appeared on September 2, 1945, at 9:02 in the morning, the time of the Japanese surrender. This 1/48-scale ship required 77,000 man-hours to construct, and is as of September 2012 on display at the Navy Museum, Washington Navy Yard, Washington, DC.[6] Recent contracts
References
External linksInformation related to Gibbs & Cox |