Line 13 of the Shenzhen Metro is one of the four new metro lines of the metro's Phase IV expansion under construction in the city of Shenzhen, Guangdong.[3][4] The 6.36km Phase 1 South section between Shenzhen Bay Checkpoint and Hi-Tech Central opened on December 28, 2024,[2] with the rest of Phase 1 and the northern extension expected to be completed and operational in 2025, and the southern extension in 2026. The first phase of the line is 23 km (14 mi) long and uses eight car type A trains with a maximum operating speed of 100 km/h (62 mph).[5] Like Line 4, Line 13 is operated by MTR Corporation (Shenzhen).
^ abc"定了!深圳地铁13号线南段明日开通" [It’s settled! The southern section of Shenzhen Metro Line 13 will open tomorrow]. Shekou News (in Simplified Chinese). 2024-12-27. Retrieved 2025-01-11.