The NSWGR built its entire route network to standard gauge. Its first line, also the first railway of New South Wales, was the railway line from Sydney to Parramatta (today: Granville railway station) completed in 1855.
The inaugural Chief Commissioner was Ben Martindale[1] and, following the enactment of the Government Railway Act, 1858 (NSW) he became Commissioner of Railways. John Rae succeeded Martindale in 1861,[2] and in 1877 Charles Goodchap was appointed Commissioner. The Government Railway Act, 1888 (NSW) set up a corporate body of three railway commissioners to manage the railways and remove them from political influence, resulting in the resignation of Goodchap.[3]
This Board of Railway Commissioners of New South Wales was in place from 22 October 1888 to 4 April 1907, and was replaced by a sole Chief Commissioner of Railways and Tramways until 22 March 1932, when a panel arrangement was restored for a period of nine months, with the Transport Commissioners of New South Wales. On 29 December 1932, the Department of Railways New South Wales was established and Thomas Joseph Hartigan was appointed Commissioner for Railways replacing the functions of the Chief Transport Commissioner.[4] The Department of Railways New South Wales become the official name of the railway and was used on most documentation (drawings & other paperwork), the NSWGR title was still used periodically on public documentation such as advertising and timetables. This continued until the creation of the Public Transport Commission on 20 October 1972. The last Commissioner for Railways was Neil McCusker.
The agency was succeeded by the Department of Railways on 1 January 1915; and then following the enactment of the Public Transport Commission Act, 1972 (NSW), the Public Transport Commission was formed; later to become the State Rail Authority on 1 July 1980.[20] Further restructures in 1996, 2001 and 2003 resulted in the establishment of the RailCorp, the agency currently responsible for the Sydney suburban and interurban rail network and rural passenger services, and for providing government and commercial freight operators with access to the rails of the Sydney metropolitan area. On 1 July 2013, the operational responsibilities of RailCorp were transferred to NSW TrainLink and Sydney Trains.[21][22]
Infrastructure
The agency built all of their track to the 4 ft 8+1⁄2 in (1,435 mm) standard gauge and ran its first official passenger train on 26 September 1855, between the Sydney terminal (just south of the current Central) and Parramatta junction (just past Granville) railway stations.
^In December 1914 Harper was granted leave of absence on account of illness, and never resumed the position. Fraser was acting commissioner from January 1915 – December 1916.[6]
^"Mr John Harper". The Sydney Morning Herald. No. 29, 483. New South Wales, Australia. 2 July 1932. p. 17. Retrieved 29 December 2021 – via National Library of Australia.